European Court of Auditors – building

Building owner

European Court of Auditors: Office for Infrastructure and Logistics (OIL)

Location

Luxembourg

The overall project objective is to update the building infrastructure to contemporary standards and best practices with respect to safety, environment and security. In this phase, the revitalisation focused on Heating-Ventilation-Air Conditioning (« HVAC »). Thus, Paul Wurth Geprolux has programmed the replacement of the aeration system, the air-conditioning and heating of the building, while maintaining normal building operations throughout the completion of the work.

Key figures

Built volume

~ 80.000 m3

Built surface

~ 24.000 m2

Project duration

2005 – 2009

Construction period

2007 – 2009

Our missions

  • Project scope
  • Preliminary design
  • Project management
  • Permitting
  • Call for tenders
  • Execution design
  • Budget management
  • Contract management
  • Works coordination
  • Commissioning